Follow the latest projects, developments and news from the METALUSA universe.
CHALLENGE – Highness of the building. – The scaffolding was 200 feet high. SOLUTION The Nor48 ® scaffolding is […]
CHALLENGE – The main challenge pertains to the sharp inclination of the roofs and the need to adjust and make […]
CHALLENGE – The adaptation of the structure to the building’s geometry; – The assembly of the structure required thorough calculations […]
CHALLENGE – Adaptation of the structure to the building’s geometry; –The normal use of the building while the work was […]
CHALLENGE – Concreting at high loads, executing the work in a short period of time. SOLUTION The construction of […]
CHALLENGE – Concreting at high loads, executing the work in a short period of time. SOLUTION The construction of […]
CHALLENGE – Concreting at high loads, executing the work in a short period of time. SOLUTION The construction of […]
CHALLENGE – The stabilisation of the Adapt Multidirectional system at the top of the building. SOLUTION The “Éspace Leopold” […]
CHALLENGE – Adaptation of the structure to the geometry of the building; – Assembly of the self-supporting structure in order […]