MetaloIbérica S.A. has developed an engineering solution with the Towrok® shoring system for the João Abel de Freitas tunnel in the Madeira Archipelago, as per a work assignment commissioned by TECNOVIA.
The placement of towers is the first stage of this work assignment. Towrok® shoring tower system is ideal for executing highly complex works, where equipment versatility is a primary condition, always in compliance with the highest safety levels, especially under high load conditions.