Follow the latest projects, developments and news from the METALUSA universe.
CCB Gaurain, located at the entrance of factory 7530 in Tournai, is a company recognized in the region for its […]
In the challenge of building a high water reservoir with complex geometry, it becomes essential to find an effective and […]
CHALLENGE – To execute facade concreting work in compliance with strict deadlines. SOLUTION The main purpose of the expansion […]
CHALLENGE – The assembly of Forteko® panels with high-strength props to achieve high concreting speeds as a basic requirement. […]
CHALLENGE – The adaptation of the elements of the Adapt Multidirectional System to the building; – The reinforcement of the […]
CHALLENGE – A study to calculate the lateral loads of the soil. – Reinforcement of the structure for large-scale ditch […]
CHALLENGE – To adapt the curvature of the panels to the diameter of the structure. SOLUTION The Roflex circular […]