The article describes the technical features of SHORFLEX and presents a case study on the containment of façades of an ongoing construction work on Rua da Praia do Bom Sucesso, Lisbon.
The case study demonstrates the use of SHORFLEX® HD portico metal support structure fixed to concrete foundation blocks, allowing the containment of 17m high walls.